
The interior of bed room 1. Railings are being installed to the balcony. Left: View from the bed room across the railings.

Pool in the foreground looking at the sit-out with the retaining wall in the far background


The pool from the upper level

East elevation with the pool in the foreground

.
At the upper level windows have been installed. The frames are black powder coated aluminium. I am working on details to provide a mosquito screen to opening windows. The available varieties look messy.
1 Comments:
Hi Chandra
Fantastic to see the progress. I have been checking back most days in vain. The house looks wonderful. Hope you are well.
Ed
Post a Comment
<< Home